Company News

Latest Innovations on Display at 2015 RWM

rwm

RWM 2015, will take place at the NEC on 15-17th September.

Middleton Engineering will be on stand 5R54. Where we will showcase the latest developments and innovations to our Twin Ram Range.

Our tried and tested Twin Ram balers are suitable for many waste applications. Our machinery has been developed to address key concerns in the waste recycling sector; safety and durability.

Baler chassis are built from rugged steel to maximise the lifetime of the machine. All wear items have improved durability.

Middleton Engineering prides itself on the quality, durability and reliability of its products and services.

For more information please contact or visit our stand representatives. Claim your free ticket for the exhibition by clicking the button below.

Posted in: Company News

Leave a Comment (0) →

A Baler For Woodchip

Picture 001 (1280x854)

The Middleton Twin Ram baler range has added wood chip to its ever extending application range. The baler is designed for medium to large throughput ranges. Our Twin Ram machines regularly see throughput in excess of 30 tonnes per hour.

To bale wood chip modifications were set to the parameters of the machine and a specially designed chute was fabricated to retain the product prior to strapping. Bales can be tied automatically using either wire or cost effective plastic strapping.

It is then necessary to wrap the wood chip bale as it leaves the baler. This is to retain all of the fragments. The bales can then be stored prior to being processed further. This system has successfully been trialled and proven at our factory. For more information please download the latest brochure and contact our sales team on 01458 860264.

 

Posted in: Company News

Leave a Comment (0) →

Middleton Engineering Approved by Safe Contractor

Middleton Engineering is delighted to announce that our excellence in Health and Safety has been recognised by Safecontractor.

Safecontractor is a leading third party accreditation scheme which recognises very high standards in health and safety management amongst UK contractors.

Under the Safecontractor scheme, Middleton Engineering underwent a vetting process which examined our health and safety procedures and our track record for safe practice.

Middleton Engineering met the high standards have been included on a SSIP database that enables clients to vet contractors to ensure standards are in place prior to any works commencing.

safecontractor

Posted in: Company News

Leave a Comment (0) →

Middleton Engineering Helps Island Waste Achieve Zero Waste to Landfill

ISLANDWASTE ME2R80F

Island Waste, Guernsey’s largest independent waste recycling business, is diverting 100 percent of the island’s waste from landfills after installing a twin ram baler and conveyor from Middleton Engineering.

Guernsey is located off the coast of Normandy. With the only landfill site at Mont Cuet expected to close in 18 months, baling and exporting the island’s trash for re-use is now key to the Guernsey’s waste management.

Continue Reading

Posted in: Company News

Leave a Comment (0) →

Plastic Strapping is here to stay

Plastic Strapping one

Our proven design, uses straps made from recycled PET and offer significant cost savings of around 50% over wire ties. The straps are fully combustible making them the ideal choice for energy from waste applications.

The Middleton Engineering strapping system can be retrofitted to any make of two ram baler. Click here for more information.

Posted in: Company News

Leave a Comment (0) →

New Year- New ideas

Middleton Engineering is looking forward to what’s shaping up to be a great 2015!

We are currently undergoing an expansion to our technical department. Our electrical engineers are attending the latest training provided by a control systems manufacturer to ensure our machines employ the very latest in control systems technology.

The recycling industry is facing new challenges everyday. That’s why Middleton Engineering are offering Free consultancy to your company to help you meet current needs and help your future progression in the recycling industry.

New service contracts taken out in the first quarter of 2015 qualify for Free operator training/ refresher courses for your operators. Ensuring they understand the importance of the safe operation of your machine, but also to ensure they are using the machine effectively and efficiently to maximise throughput and longevity.

Whatever your recycling requirements contact Middleton Engineering today.

 

Posted in: Company News

Leave a Comment (0) →

Autumn 2014

ME2R80F

Greetings all!

Middleton Engineering Twin Ram Balers continue to gain approval from leading UK recycling companies. The latest case study comes from W&S Waste Recycling Services, after they took delivery of one of our powerful ME2R100 machines.

Another of our established Customers has taken delivery of one of our energy efficient Twin Ram Balers. This ME2R80F was built fitted with our industry leading Dual Tying Head.

Our Sales and Marketing team have had a busy Autumn visiting the RWM in September and the Poleko exhibition in Northwest Poland. Where they have been investigating European markets and trends.

Remember, Middleton Engineering are the only recycling engineering company to hold over 20,000 baler servicing parts in stock at all times. We can produce any bespoke or out of stock items practically overnight. To ensure your machinery is running when you need it to be.

Don’t forget to subscribe to our new and improved YouTube channel and why not follow us on Twitter @MiddletonEng

Posted in: Company News

Leave a Comment (0) →

W&S Recycling takes on rigid plastics with Twin Ram Baler from Middleton Engineering

me2r100bwindow bale
Expanding waste management company W&S Recycling Services based in Poole, Dorset, has taken delivery of a powerful twin-ram baler from Middleton Engineering as part of a new venture to recycle rigid plastics from Household Waste Recycling Centres (HWRCs) and commercial customers across Dorset.

The company, which provides waste management services to the Dorset Waste Partnership, Bournemouth Borough Council, Oxfordshire County Council and commercial customers nationally, already manages a wide range of waste streams with the goal to maximise recycling and minimise waste to landfill.

The new ME2R100 from Middleton Engineering now installed at the company’s recycling depot in Hurn, Christchurch, will make it easier to bale and recycle a range of hard plastics such as PP, PE and PVC waste, including toys, crates and garden furniture, a commodity which has traditionally gone straight to landfill.

Read More

 

Posted in: Company News

Leave a Comment (0) →
Page 3 of 5 12345