Case Studies & Documents

Latest Case Studies

Here you will find case studies and testimonials of what Middleton Engineering have done for companies similar to yours.

Contact us today and see what we can do for you

[button url=”http://www.middletonengineering.co.uk//contact” class=”button” size=”jumbo” color=”white” target=”_self” lightbox_content=”” lightbox_description=””] Find out more. [/button]

[divider style=”hr-solid-double”]

Wiltshire Waste ramps up recycling capacity

A family run business recently introduced a top of the range ME2R150 baler from Middleton Engineering to improve throughput and versatility.

[button url=”http://www.middletonengineering.co.uk/wp-content/uploads/Middleton-Grist-Group-case-study.pdf” class=”button” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=”Open Case Study”] Open Case Study [/button]
[divider style=”hr-solid-double”]

Yield UK – Annual maintenance programme extends reliability

Located in Widnes between Liverpool and Manchester, Yield UK provides specialist Recycling and Waste Management services, including security shredding and product destruction, to a Range of public and private sector organisations – supporting clients in their legal and commercial responsibilities for minimising waste to landfill.

[button url=”http://www.middletonengineering.co.uk/wp-content/uploads/Middleton-Yield-Case-Study-08.11.12.pdf” class=”button” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]
[divider style=”hr-solid-double”]

Retrofit plastic strapping solution improves RDF capabilities for Biffa

Processing waste for Refuse Derived Fuel (RDF) economically and efficiently is part of Biffa’s commitment to achieving zero waste to landfill. However, until now, baled RDF waste was tied using conventional steel wire, a costly resource and one that incurs a premium with Waste to Energy plants.

[button url=”http://www.middletonengineering.co.uk/wp-content/uploads/Middleton-Case-Study-Biffa-V-1.pdf” class=”button” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]
[divider style=”hr-solid-double”]

The Range gets greener

Successful home, leisure and garden products retail group, The Range, has an active policy on minimising waste to landfill and has its own well established centralised recycling facility.

[button url=”http://www.middletonengineering.co.uk//wp-content/uploads/The-Range-Case-Study.pdf” class=”button” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]

[divider style=”hr-solid-double”]

Middleton Balers Support The Co-operative’s Sustainability Targets

An important element in The Co-operative’s drive for zero waste, Middleton Engineering has been supplying quality baling equipment for plastic and card to the Group’s distribution centres, including the merged Kwik-Save and Somerfield businesses, since 1997.

[button url=”http://www.middletonengineering.co.uk//wp-content/uploads/Co-operative-Case-Study.pdf” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]

[divider style=”hr-solid-double”]

Middleton Twin Ram Baler supports Stirling Council’s drive to zero waste

Supporting its drive towards zero waste Stirling Council Waste Services is using Middleton’s latest twin ram baler – the Middleton ME2R80 – to improve production and efficiency at its Polmaise Recycling and Baling Facility, near Fallin in Scotland.

[button url=”http://www.middletonengineering.co.uk//wp-content/uploads/Stirling-Council-Case-Study.pdf” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]

[divider style=”hr-solid-double”]

Refurbished baler increases Viridor’s throughput 10 fold

To increase throughput at its Plymouth waste recycling facility, Viridor turned to Middleton Engineering to supply a fully automatic baler, one that was capable of dealing with all waste streams, but at the same time robust enough to ensure minimal downtime.

[button url=”http://www.middletonengineering.co.uk//wp-content/uploads/Viridor-Case-Study.pdf” size=”jumbo” color=”green-2″ target=”_self” lightbox_content=”” lightbox_description=””] Open Case Study [/button]

[divider style=”hr-solid-double”]